Heating a church means combining respect for history with modern technology. At Regulus, we know that every project of this kind requires not only technical expertise but also a sensitive approach to a space that has its own atmosphere and value. At St. Adalbert’s Church, several issues needed to be addressed at once—replacing the aging gas boilers, maintaining compatibility with the existing solar system, and ensuring comfort for worshippers as well as residents and visitors to the adjacent areas.

Hero

Category

Heat Pump

Type of reference

NGOs

Construction period

2024

Location

České Budějovice (map)

Installation Company

Pavel Večerník, České Budějovice

It Wasn’t Just About Technology

The technical phase began with the “classic” approach – eight boreholes, each 130 metres deep. These form the foundation of the entire system. While drilling work was taking place outside, the presbytery floor inside the church was being removed and channels for new pipework were being prepared. All of this had to be carefully coordinated with the dismantling and refurbishment of the pews in order to keep the schedule on track and avoid disrupting regular operations.

The Chosen Solution

In the end, the project team selected a cascade system of Regulus EcoPart heat pumps – 1x EcoPart 417 and 3x EcoPart 414. Their operation is managed by the Regulus IR 14 CTC controller, which also controls the solar thermal system and several separate heating circuits both in the church and in the adjacent building housing the Salesian youth centre.

Thanks to this solution, the church now benefits from a combination of traditional radiators, underfloor heating in the presbytery, hot-water heat exchangers beneath the pews, and heating for both the confessionals and the church entrance.

Modern Comfort Beneath the Church Vaults

Following the renovation, visitors to St. Adalbert’s Church and the Salesian centre can now enjoy the results: comfortable warmth in the pews, a heated presbytery area, and warm confessionals. The entire system is more energy-efficient, environmentally friendly, and designed to operate reliably for many years to come. Thanks to modern technology, this historic building has gained a new level of comfort without losing its unique character.

Quick Project Facts

  • Location: St. Adalbert’s Church, České Budějovice
  • Project brief: replacement of gas boilers for heating the Salesian centre, new heating for the presbytery, church pews and confessionals, and tempering of the church entrance area
  • New heat source: cascade system of Regulus EcoPart ground-source heat pumps (1× EcoPart 417 + 3× EcoPart 414)
  • System control: Regulus IR 14 CTC controller (including solar system control)
  • Boreholes: 8 × 130 m
  • Number of heating circuits: 6